Loading...
Legal Description Attachments McQueen Smith Road1 PROJECT NO. STPOA-7812(600) CPMS PROJ. NO. 100054982 ATTACHMENT “A” TRACT N0. 3B A part of the NE 1/4 of NE 1/4, Section 23, Township 17N, Range 16E, and a part of the and the SE 1/4 of SE 1/4, Section 14, Township 17N, Range 16E, identified as Tract No. 3B on Project No. STPOA-7812(600) in Autauga County, Alabama and being more fully described as follows: Parcel # 1 of # 2: COMMENCE at a Found Nail at the Northeast Corner of the Southeast Quarter of the Southeast Quarter of Section 23, Township 17 North, Range 16 East, Autauga County, Alabama; thence S 88° 50' 26" W for a distance of 38.68 feet to a point, that is a point on the project centerline of McQueen Smith Road at 19+65.47; thence N 01° 09' 34" W for a distance of 47.40 feet to a point, that is a point on the project centerline of McQueen Smith Road at 20+12.87; thence N 00° 43' 17" E for a distance of 1227.31 feet to a point, that is a point on the project centerline of McQueen Smith Road at 32+40.17; thence N 01° 11' 41" W for a distance of 1850.25 feet to a point, that is a point on the project centerline of McQueen Smith Road at 50+90.42; thence leaving the project centerline of McQueen Smith Road run S 88° 48' 19" W for a distance of 38.22 feet to a point on the Present West Right-of-Way of McQueen Smith Road, that is a point 38.22 left of and at right angle to the project centerline of McQueen Smith Road at 50+90.42, said point being the POINT OF BEGINNING of the following described Right-of-Way Taking; thence leaving the Present West Right-of-Way of McQueen Smith Road run S 88° 54' 16" W for a distance of 25.59 feet to a point, that is a point 63.81 left of and at right angle to the project centerline of McQueen Smith Road at 50+90.47; thence N 20° 36' 24" E for a distance of 10.27 feet to a point, that is a point 60.00 left of and at right angle to the project centerline of McQueen Smith Road at 51+00.00; thence N 01° 11' 41" W for a distance of 216.19 feet to a point, that is a point 60.00 left of and at right angle to the project centerline of McQueen Smith Road at 53+16.19; thence N 01° 11' 41" W for a distance of 50.00 feet to a point, that is a point 60.00 left of and at right angle to the project centerline of McQueen Smith Road at 53+66.19; thence N 01° 11' 41" W for a distance of 31.28 feet to a point, that is a point 60.00 left of and at right angle to the project centerline of McQueen Smith Road at 53+98.59; thence N 13° 16' 38" W for a distance of 52.38 feet to a point, that is a point 70.00 left of and at right angle to the project centerline of McQueen Smith Road at 54+50.00; thence N 02° 15' 31" W for a distance of 400.00 feet to a point, that is a point 70.00 left of and at right angle to the project centerline of McQueen Smith Road at 58+50.00; thence N 33° 13' 20" W for a distance of 58.31 feet to a point, that is a point 100.00 left of and at right angle to the project centerline of McQueen Smith Road at 59+00.00; thence N 02° 15' 31" W for a distance of 20.00 feet to a point, that is a point 100.00 left of and at right angle to the project centerline of McQueen Smith Road at 59+20.00; thence N 35° 36' 59" E for a distance of 3.50 feet to a point, that is a point 97.85 left of and at right angle to the project centerline of McQueen Smith Road at 59+22.76; 2 thence S 89° 00' 00" E for a distance of 70.86 feet to a point on the Present West Right- of-Way of McQueen Smith, that is a point 27.11 left of and at right angle to the project centerline of McQueen Smith Road at 59+18.73; thence S 01° 05' 42" E along the Present West Right-of-Way of McQueen Smith for a distance of 827.72 feet to the POINT OF BEGINNING, that is a point 38.22 left of and at right angle to the project centerline of McQueen Smith Road at 50+90.42; said Right-of-Way Taking containing 0.63 acres more or less. Parcel # 2 of # 2: COMMENCE at a Found Nail at the Northeast Corner of the Southeast Quarter of the Southeast Quarter of Section 23, Township 17 North, Range 16 East, Autauga County, Alabama; thence S 88° 50' 26" W for a distance of 38.68 feet to a point, that is a point on the project centerline of McQueen Smith Road at 19+65.47; thence N 01° 09' 34" W for a distance of 47.40 feet to a point, that is a point on the project centerline of McQueen Smith Road at 20+12.87; thence N 00° 43' 17" E for a distance of 1227.31 feet to a point, that is a point on the project centerline of McQueen Smith Road at 32+40.17; thence N 01° 11' 41" W for a distance of 2157.30 feet to a point, that is a point on the project centerline of McQueen Smith Road at 53+97.48; thence N 02° 15' 31" W for a distance of 521.26 feet to a point, on the project centerline of McQueen Smith Road at 59+18.73; thence leaving the project centerline of McQueen Smith Road run S 87° 44' 29" W for a distance of 27.11 feet to a point on the Present West Right-of-Way of McQueen Smith Road, that is a point 27.11 left of and at right angle to the project centerline of McQueen Smith Road at 59+18.73, said point being the POINT OF BEGINNING of the following described Right-of-Way Taking; thence leaving the Present West Right-of-Way of McQueen Smith Road run N 89° 00' 00" W for a distance of 70.86 feet to a point, that is a point 97.85 left of and at right angle to the project centerline of McQueen Smith Road at 59+22.76; thence N 35° 36' 59" E for a distance of 53.51 feet to a point, that is a point 65.00 left of and at right angle to the project centerline of McQueen Smith Road at 59+65.00; thence N 02° 15' 31" W for a distance of 185.00 feet to a point, that is a point 65.00 left of and at right angle to the project centerline of McQueen Smith Road at 61+50.00; thence N 37° 15' 02" W for a distance of 61.03 feet to a point, that is a point 100.00 left of and at right angle to the project centerline of McQueen Smith Road at 62+00.00; thence N 09° 03' 05" E for a distance of 101.98 feet to a point, that is a point 80.00 left of and at right angle to the project centerline of McQueen Smith Road at 63+00.00; thence N 02° 15' 31" W for a distance of 350.00 feet to a point, that is a point 80.00 left of and at right angle to the project centerline of McQueen Smith Road at 66+50.00; thence N 24° 18' 23" E for a distance of 55.90 feet to a point, that is a point 55.00 left of and at right angle to the project centerline of McQueen Smith Road at 67+00.00; thence N 02° 15' 31" W for a distance of 101.67 feet to a point, that is a point 55.00 left of and at right angle to the project centerline at 68+01.67; thence N 89° 47' 42" E for a distance of 36.20 feet to a point on the Present West Right- of-Way of McQueen Smith Road, that is a point 18.82 left of and at right angle to the project centerline at 68+00.37; 3 thence S 01° 43' 14" E along the Present West Right-of-Way of McQueen Smith Road the for a distance of 861.65 feet to a point. that is a point 26.91 left of and at right angle to the project centerline at 59+38.76; thence S 01° 41' 45" E along the Present West Right-of-Way of McQueen Smith Road for a distance of 20.03 feet the POINT OF BEGINNING, that is a point 27.11 left of and at right angle to the project centerline at 59+18.73; said Right-of-Way Taking containing 1.04 acres more or less. 4 TRACT N0. 3 TEMPORARY CONSTRUCTION EASEMENT NO. 1 OF 5: A part of the South 1/2 of the South 1/2 of Fractional Section 24, T17-N, R16-E, in Autauga County, Alabama, identified as Tract No. 3 on Project No. STPOA-7812(600) and being more fully described as follows: COMMENCE at the Northeast Corner of the Southeast Quarter of the Southeast Quarter of Section 23, Township 17 North, Range 16 East, Autauga County, Alabama; thence S 88° 50' 26" W for a distance of 38.68 feet to a point, that is a point on project centerline of McQueen Smith Road at 19+65.47; thence S 01° 09' 34" E for a distance of 375.47 feet to a point, on project centerline of McQueen Smith Road at 15+90.00; thence N 88° 50' 26" E for a distance of 78.30 feet to a point, that is a point 78.30 right of and at right angle to the project centerline of McQueen Smith Road at 15+90.00, said point being the POINT OF BEGINNING of the following described Temporary Construction Easement; thence N 88° 50' 26" E for a distance of 16.70 feet to a point, that is a point 95.00 right of and at right angle to the project centerline of McQueen Smith Road at 15+90.00; thence S 01° 09' 34" E for a distance of 36.75 feet to a point, that is a point 95.00 right of and at right angle to the project centerline of McQueen Smith Road at 15+53.25; thence N 84° 16' 30" W for a distance of 16.80 feet to a point, that is a point 78.32 right of and at right angle to the project centerline of McQueen Smith Road at 15+55.27; thence N 01° 12' 02" W for a distance of 34.73 feet to a point, that is a point 78.30 right of and at right angle to the project centerline of McQueen Smith Road at 15+90.00, said point being the POINT OF BEGINNING; said Temporary Construction Easement containing 0.01 acres more or less. TEMPORARY CONSTRUCTION EASEMENT NO. 2 OF 5: A part of the North 1/2 of the South 1/2 of Fractional Section 24, T17-N, R16-E, in Autauga County, Alabama, identified as Tract No. 3 on Project No. STPOA-7812(600) and being more fully described as follows: COMMENCE at the Northeast Corner of the Southeast Quarter of the Southeast Quarter of Section 23, Township 17 North, Range 16 East, Autauga County, Alabama; thence S 88° 50' 26" W for a distance of 38.68 feet to a point, that is a point on project centerline of McQueen Smith Road at 19+65.47; thence N 01° 09' 34" W for a distance of 47.40 feet to a point, on project centerline of McQueen Smith Road at 20+12.87; thence N 00° 43' 17" E for a distance of 387.13 feet to a point, on project centerline of McQueen Smith Road at 24+00.00; thence S 89° 16' 43" E for a distance of 66.55 feet to a point, that is a point 66.55 right of and at right angle to the project centerline of McQueen Smith Road at 24+00.00, said point being the POINT OF BEGINNING of the following described Temporary Construction Easement; thence N 01° 08' 02" W for a distance of 220.12 feet to a point, that is a point 59.42 right of and at right angle to the project centerline of McQueen Smith Road at 26+20.00; 5 thence N 46° 32' 20" E for a distance of 28.70 feet to a point, that is a point 80.00 right of and at right angle to the project centerline of McQueen Smith Road at 26+40.00; thence N 00° 43' 17" E for a distance of 30.00 feet to a point, that is a point 80.00 right of and at right angle to the project centerline of McQueen Smith Road at 26+70.00; thence S 41° 05' 55" E for a distance of 127.48 feet to a point, that is a point 165.00 right of and at right angle to the project centerline of McQueen Smith Road at 25+75.00; thence S 00° 43' 17" W for a distance of 40.00 feet to a point, that is a point 165.00 right of and at right angle to the project centerline of McQueen Smith Road at 25+35.00; thence N 89° 16' 43" W for a distance of 40.00 feet to a point, that is a point 125.00 right of and at right angle to the project centerline of McQueen Smith Road at 25+35.00; thence S 00° 43' 17" W for a distance of 95.00 feet to a point, that is a point 125.00 right of and at right angle to the project centerline of McQueen Smith Road at 24+40.00; thence S 56° 20' 12" W for a distance of 70.83 feet to a point, that is a point 66.55 right of and at right angle to the project centerline of McQueen Smith Road at 24+00.00, said point being the POINT OF BEGINNING said Temporary Construction Easement containing 0.37 acres more or less. TEMPORARY CONSTRUCTION EASEMENT NO. 3 OF 5: A part of the North 1/2 of the South 1/2 of Fractional Section 24, T17-N, R16-E, in Autauga County, Alabama, identified as Tract No. 3 on Project No. STPOA-7812(600) and being more fully described as follows: COMMENCE at the Northeast Corner of the Southeast Quarter of the Southeast Quarter of Section 23, Township 17 North, Range 16 East, Autauga County, Alabama; thence S 88° 50' 26" W for a distance of 38.68 feet to a point, that is a point on project centerline of McQueen Smith Road at 19+65.47; thence N 01° 09' 34" W for a distance of 47.40 feet to a point, on project centerline of McQueen Smith Road at 20+12.87; thence N 00° 43' 17" E for a distance of 1178.55 feet to a point, on project centerline of McQueen Smith Road at 31+91.42; thence S 89° 16' 43" E for a distance of 40.91 feet to a point, that is a point 40.91 right of and at right angle to the project centerline of McQueen Smith Road at 31+91.42; thence S 84° 04' 57" E for a distance of 11.48 feet to a point, that is a point 52.34 right of and at right angle to the project centerline of McQueen Smith Road at 31+90.38, said point being the POINT OF BEGINNING of the following described Temporary Construction Easement: thence S 84° 04' 57" E for a distance of 6.78 feet to a point, that is a point 59.10 right of and at right angle to the project centerline of McQueen Smith Road at 31+89.76; thence S 05° 13' 23" W for a distance of 29.85 feet to a point, that is a point 56.76 right of and at right angle to the project centerline of McQueen Smith Road at 31+60.00; thence N 07° 32' 39" W for a distance of 30.69 feet to a point, that is a point 52.34 right of and at right angle to the project centerline of McQueen Smith Road at 31+90.38, said point being the POINT OF BEGINNING said Temporary Construction Easement containing 0.01 acres more or less. 6 TEMPORARY CONSTRUCTION EASEMENT NO. 4 OF 5: A part of the Northeast 1/4 of the Southeast 1/4 of Section 23, T17-N, R16-E, in Autauga County, Alabama, identified as Tract No. 3 on Project No. STPOA-7812(600) and being more fully described as follows: COMMENCE at the Northeast Corner of the Southeast Quarter of the Southeast Quarter of Section 23, Township 17 North, Range 16 East, Autauga County, Alabama; thence S 88° 50' 26" W for a distance of 38.68 feet to a point, that is a point on project centerline of McQueen Smith Road at 19+65.47; thence N 01° 09' 34" W for a distance of 47.40 feet to a point, that is a point on project centerline of McQueen Smith Road at 20+12.87; thence N 00° 43' 17" E for a distance of 1178.55 feet to a point, on project centerline of McQueen Smith Road at 31+91.42; thence N 00° 43' 17" E for a distance of 47.58 feet to a point, that is a point on project centerline of McQueen Smith Road at 32+39.00; thence N 89° 16' 43" W for a distance of 55.00 feet to a point, that is a point 55.00 left of and at right angle to the project centerline of McQueen Smith Road at 32+39.00, said point being the POINT OF BEGINNING of the following described Temporary Construction Easement; thence N 65° 55' 15" W for a distance of 33.17 feet to a point, that is a point 85.00 left of and at right angle to the project centerline of McQueen Smith Road at 32+55.00; thence N 01° 11' 41" W for a distance of 10.16 feet to a point, that is a point 85.00 left of and at right angle to the project centerline of McQueen Smith Road at 32+65.16; thence N 88° 55' 58" E for a distance of 30.03 feet to a point, that is a point 54.97 left of and at right angle to the project centerline of McQueen Smith Road at 32+65.10; thence S 01° 12' 01" E for a distance of 23.08 feet to a point, that is a point 54.97 left of and at right angle to the project centerline of McQueen Smith Road at 32+42.01; thence S 00° 43' 17" W for a distance of 1.17 feet to a point, that is a point 55.00 left of and at right angle to the project centerline of McQueen Smith Road at 32+39.00, said point being the POINT OF BEGINNING; said Temporary Construction Easement containing 0.01 acres more or less. TEMPORARY CONSTRUCTION EASEMENT NO. 5 OF 5: A part of the Southeast 1/4 of the Northeast 1/4 of Section 23, T17-N, R16-E, in Autauga County, Alabama, identified as Tract No. 3 on Project No. STPOA-7812(600) and being more fully described as follows: COMMENCE at the Northeast Corner of the Southeast Quarter of the Southeast Quarter of Section 23, Township 17 North, Range 16 East, Autauga County, Alabama; thence S 88° 50' 26" W for a distance of 38.68 feet to a point, that is a point on project centerline of McQueen Smith Road at 19+65.47; thence N 01° 09' 34" W for a distance of 47.40 feet to a point, that is a point on project centerline of McQueen Smith Road at 20+12.87; thence N 00° 43' 17" E for a distance of 1227.31 feet to a point, that is a point on project centerline of McQueen Smith Road at 32+40.17; thence N 01° 11' 41" W for a distance of 801.89 feet to a point, that is a point that is a point on project centerline of McQueen Smith Road at 40+42.06; 7 thence S 88° 48' 19" W for a distance of 60.00 feet to a point, that is a point 60.00 left of and at right angle to the project centerline of McQueen Smith Road at 40+42.06, said point being the POINT OF BEGINNING of the following described Temporary Construction Easement; thence S 39° 07' 08" W for a distance of 15.46 feet to a point, that is a point 70.00 left of and at right angle to the project centerline of McQueen Smith Road at 40+30.27; thence N 01° 11' 41" W for a distance of 319.73 feet to a point, that is a point 70.00 left of and at right angle to the project centerline of McQueen Smith Road at 43+50.00; thence N 88° 48' 19" E for a distance of 10.00 feet to a point, that is a point 60.00 left of and at right angle to the project centerline of McQueen Smith Road at 43+50.00; thence S 01° 11' 41" E for a distance of 307.94 feet to a point, that is a point 60.00 left of and at right angle to the project centerline of McQueen Smith Road at 40+42.06, said point being the POINT OF BEGINNING; said Temporary Construction Easement containing 0.07 acres more or less. PROJECT NO. STPOA-7812(600) CPMS PROJ. NO. 100054982 ATTACHMENT “B” TRACT N0. 4 A part of the SE 1/4 of SE 1/4, Section 23, Township 17N, Range 16E, identified as Tract No. 4 on Project No. STPOA-7812(600) in Autauga County, Alabama and being more fully described as follows: Parcel # 1 of # 1: COMMENCE at the Northeast Corner of the Southeast Quarter of the Southeast Quarter of Section 23, Township 17 North, Range 16 East, Autauga County, Alabama; thence S 88° 50' 26" W for a distance of 38.68 feet to a point, that is a point on the project centerline of McQueen Smith Road at 19+65.47; thence S 01° 09' 34" E for a distance of 103.82 feet to a point, that is a point on the project centerline of McQueen Smith Road at 18+61.65, said point being the POINT OF BEGINNING of the following described Right-of-Way Taking; thence N 88° 28' 12" E for a distance of 2.24 feet to a point, that is a point 2.24 right of and at right angle to the project centerline of McQueen Smith Road at 18+61.66; thence S 00° 40' 31" E for a distance of 451.42 feet to a point, that is a point 1.57 left and at right angle to the project centerline of McQueen Smith Road at 14+10.26; thence S 69° 37' 54" W for a distance of 56.58 feet to a point, that is a point 55.00 left of and at right angle to the project centerline of McQueen Smith Road at 13+91.65; thence N 01° 09' 34" W for a distance of 469.65 feet to a point, that is a point 55.00 left of and at right angle to the project centerline of McQueen Smith Road at 18+61.29; thence N 88° 28' 12" E for a distance of 55.00 feet to a point, that is a point on project centerline of McQueen Smith Road at 18+61.65; said point being the POINT OF BEGINNING. said Right-of-Way Taking containing 0.58 acres more or less. PROJECT NO. STPOA-7812(600) CPMS PROJ. NO. 100054982 ATTACHMENT “C” TRACT N0. 17 A part of the North 1/2, of North 1/2, Fractional Section 13, Township 17 N, Range 16 E, identified as Tract No.17 on Project No. STPOA-7812(600) in Autauga County, Alabama and being more fully described as follows: Parcel #1 of #1: COMMENCE at the Southwest Corner of the South Half of the North Half of Fractional Section 13, Township 17 North, Range 16 East, Autauga County, Alabama; thence N 89° 53' 51" W for a distance of 17.43 feet to a point, that is a point on project centerline of McQueen Smith Road at 85+76.42; thence N 00° 06' 09" E for a distance of 180.21 feet to a point, that is a point on project centerline of McQueen Smith Road at 87+56.63; thence N 00° 40' 01" E for a distance of 785.46 feet to a point, that is a point on project centerline of McQueen Smith Road at 95+42.09; thence N 00° 20' 47" W for a distance of 822.03 feet to a point, that is a point on project centerline of McQueen Smith Road at 103+64.12; thence N 89° 39' 13" E for a distance of 38.26 feet to a point, that is a point 38.26 right of and at right angle to the project centerline of McQueen Smith Road at 103+64.12, said point being the POINT OF BEGINNING of the following described Right-of-Way Taking; thence S 82° 15' 40" E for a distance of 3.78 feet to a point, that is a point 42.00 right of and at right angle to the project centerline of McQueen Smith Road at 103+63.59; thence S 00° 20' 47" E for a distance of 235.09 feet to a point, that is a point 42.00 right of and at right angle to the project centerline of McQueen Smith Road at 101+28.49; thence S 89° 01' 25" W for a distance of 2.06 feet to a point, that is a point 39.94 right of and at right angle to the project centerline of McQueen Smith Road at 101+28.47; thence N 00° 45' 17" W for a distance of 235.65 feet to a point, that is a point 38.26 right of and at right angle to the project centerline of McQueen Smith Road at 103+64.12, said point being the POINT OF BEGINNING. said Right-of-Way Taking containing 0.02 acres more or less. TOGETHER WITH THE FOLLOWING DESCRIBED TEMPORARY CONSTRUCTION EASEMENT: TEMPORARY CONSTRUCTION EASEMENT NO. 1 OF 1: A part of the North 1/2 of the North 1/2 of Fractional Section 13, T17-N, R16-E, in Autauga County, Alabama, identified as Tract No. 17 on Project No. STPOA-7812(600) and being more fully described as follows: COMMENCE at the Southwest Corner of the South Half of the North Half of Fractional Section 13, Township 17 North, Range 16 East, Autauga County, Alabama; thence N 89° 53' 51" W for a distance of 17.43 feet to a point, that is a point on project centerline of McQueen Smith Road at 85+76.42; thence N 00° 06' 09" E for a distance of 180.21 feet to a point, that is a point on project centerline of McQueen Smith Road at 87+56.63; thence N 00° 40' 01" E for a distance of 785.46 feet to a point, that is a point on project centerline of McQueen Smith Road at 95+42.09; thence N 00° 20' 47" W for a distance of 822.03 feet to a point, that is a point on project centerline of McQueen Smith Road at 103+64.12; thence N 89° 39' 13" E for a distance of 38.26 feet to a point, that is a point 38.26 right of and at right angle to the project centerline of McQueen Smith Road at 103+64.12; thence S 82° 15' 40" E for a distance of 3.78 feet to a point, that is a point 42.00 right of and at right angle to the project centerline of McQueen Smith Road at 103+63.59, said point being the POINT OF BEGINNING of the following described Temporary Construction Easement; thence S 82° 15' 40" E for a distance of 7.07 feet to a point, that is a point 49.00 right of and at right angle to the project centerline of McQueen Smith Road at 103+62.59; thence S 00° 20' 47" E for a distance of 234.02 feet to a point, that is a point 49.00 right of and at right angle to the project centerline of McQueen Smith Road at 101+28.57; thence S 89° 01' 25" W for a distance of 7.00 feet to a point, that is a point 42.00 right of and at right angle to the project centerline of McQueen Smith Road at 101+28.49; thence N 00° 20' 47" W for a distance of 235.09 feet to a point, that is a point 42.00 right of and at right angle to the project centerline of McQueen Smith Road at 103+63.59, said point being the POINT OF BEGINNING. said Temporary Construction Easement containing 0.04 acres more or less.